Cooper Pump Solutions supplied a reliable leak free solution for this project. The project required two creek bypass’ with a flow of 4,000 gallon per minute each, as well as proper fish protection. Cooper Pump Solutions replaced one of their competitors onsite, as their equipment was unable to get the creek bypass under control. With winter approaching, this would have caused serious issues for the project. If the system had not been winterized by Cooper Pump Solutions, it would be unable to operate during the winter months.
GTA Creek Bypass for Channel Rehabilitation