A storm line in Kitchener, Ontario was supposedly abandoned, but it was in fact still in use. The client would experience flooding on their jobsite every time it rained, which is why Cooper Pump Solutions was called. Cooper immediately dispatched a system capable of a complete bypass of the incoming sewer to the adjacent storm collection system. The system would operate automatically every time it rained afterwards, without a single noise complaint from the residential buildings close by.
Emergency Storm Sewer Bypass